Blowout Wash Bridge

The City of Cottonwood planned bridge deck rehabilitation for the Blowout Wash Bridge  located on Pima Street between 2nd and 3rd Streets in the City of Cottonwood. The bridge was constructed in 1936 and is a single-span steel girder bridge across Blowout Wash with asphalt-paved roadway and barriers consisting of concrete curb and chain-link fence. ADOT identified deterioration to the bridge deck, barrier, and abutments, and girder corrosion. Per ADOT standards, DSG completed agency scoping, hazardous materials review and a biological review for the project.

Location: Cottonwood, AZ
Timeframe:
November 2020 – September 2021
Accomplishments: Effective team coordination during scoping for concerned residents  
Challenges: Determining effects to special status species near Verde River